LOADING...
ACTIVE
BACKUP
ACTIVE
FIREWALL
DETECTED
THREAT
PENDING
SYNC
LOCKED
DATA VAULT
IMPORTED FREELANCE MISSION
ENDED Wed 22 Apr 01:30:08 - Wed 22 Apr 08:35:55
0 enlisted
You have not enlisted
Login to see if you can take part

Campaign Overview: Jetunba Stage 2 – Water Production

This campaign runs from 22 April YC128 to 22 May YC128. Capsuleers are called to assist in Stage 2 of Jetunba Do’bara: The Hearth Reborn by producing 40,480 units of Water (2,024 runs). This purified water is a key resource for sustaining colony growth and must be delivered to the Dammalin VII - Moon 5 - Quafe Company Factory.

Strategic Location and Security

The delivery destination lies within Dammalin, a vital 0.5 security status solar system located deep within the Huvilma constellation of the Heimatar region. Operating under the sovereign jurisdiction of the Minmatar Republic, this system is widely known as the "Dammalin Industrial Colonies," serving as one of the most critical industrial and mining hubs in mid-sec territory. The surrounding Huvilma constellation is often referred to as the "Bleeding Hinge of Heimatar," acting as a frontline theatre in the ongoing conflict against the Amarr Empire.

This industrial push occurs against a backdrop of heightened regional tension. As detailed in the Republic Border Patrol mission (currently Accepted, with capsuleers actively involved as Participants), the Minmatar Republic faces constant pressure from hostile forces, including persistent incursions by the Amarr Empire and the Angel Cartel. Maintaining secure supply lines in Dammalin is paramount to the survival of the Jetunba Do’bara initiative.

Architects of the Hearth

The initiative was created by DeT Resprox on behalf of the T.R.I.A.D corporation. Founded in YC108, T.R.I.A.D stands as an ideological pillar of the Matari resistance and serves as a core executor of the Ushra'Khan alliance. Their operational mandate is explicitly focused on the liberation of Minmatar slaves and the defense of tribal territories, making the successful establishment and supply of Jetunba Do’bara a matter of profound cultural and strategic importance rather than mere corporate expansion.

Building on The First Stones

This water production phase directly builds upon the massive logistical foundations laid during Stage One. Several precursor missions are currently marked as Accepted, with capsuleers actively involved as Participants. Notably, The First Stones: Aqueous liquids (running from 14 April YC128 to 14 May YC128) secured over 2.6 million units of aqueous liquids for the Quafe Company Factory, providing the raw materials required for this current refinement stage.

The story of Jetunba speaks of gathering the primal harvests of soil, sea, and sky. To that end, pilots have been engaged in multiple concurrent Stage One operations. The First Stones : Felsic Magma and The First Stones: Non-CS Crystals demand millions of units of raw planetary materials to build the physical foundations of the settlement. Simultaneously, The First Stones: Microorganisms requires the careful handling of volatile cultures necessary for future life-support and ecological systems, while The First Stones: Noble Gas, The First Stones: Base Metals, and The First Stones: Carbon Compounds secure the industrial backbone of the colony. All of these efforts culminate in the current need for purified Water to sustain the growing population.

Logistics, Payout, and Administration

To facilitate Stage 2, participants will receive 607,200 units of Aqueous Liquids at 2.74 ISK per unit (totaling 16,637,280.00 ISK) from alliance stockpiles upon acceptance of the contract. No upfront payment is provided; this ensures commitment and the controlled use of materials. Upon successful completion and delivery of the 40,480 units of Water, participants will be paid 31,574,400.00 ISK.

Please allow up to 24 hours for contracts and final payout due to administrator availability. Administrative oversight of these sprawling efforts continues steadily, as noted in the PANDORA MONTHLY DIGEST — MARCH published on 6 April YC128, which reviewed recent concluded campaigns and reward distributions to ensure the logistical engine of the Republic remains well-oiled.

REWARDS ON OFFER
OBJECTIVES
HELP SUPPLY THE DELIVERY OF 40,480 UNITS OF Water TO Dammalin VII - Moon 5 - Quafe Company Factory
IMPORTANT NOTES

This is a freelance job, broadcasted from the following systems: Dammalin

Theme Color

RTL Support
Easily switch to right-to-left layout for Arabic, Hebrew, and other RTL languages.