Capsuleers across New Eden are called upon to assist in Stage 2 of the Jetunba Do’bara: The Hearth Reborn initiative. This specific operation, officially designated as Jetunba Stage 2 – Water-Cooled CPU Production, runs from 23 April YC128 to 23 May YC128, with initial contract phases targeting a 7 May YC128 completion.
This mission requires the production of 2,360 units of Water-Cooled CPU, equating to 472 intensive industrial runs. In total, 27,040 units of Water-Cooled CPU must be delivered to the Quafe Company Factory located at Dammalin VII - Moon 5.
The delivery destination, Dammalin, is a 0.5 security status solar system situated deep within the Huvilma constellation of the Heimatar region. Under the sovereign jurisdiction of the Minmatar Republic, it serves as a critical industrial and mining hub. The Huvilma constellation itself is often referred to in archival dossiers as the "Bleeding Hinge of Heimatar," acting as a vital frontline theatre in the ongoing conflict against the Amarr Empire.
This operation was authorized by DeT Resprox on behalf of T.R.I.A.D. Founded in YC108, T.R.I.A.D stands as one of the oldest capsuleer organizations in the Minmatar Republic loyalist bloc. As a core executor of the Ushra'Khan alliance, the corporation operates with a strict paramilitary mandate focused on the liberation of Minmatar slaves, the defense of tribal territories, and the systematic dismantling of Amarrian imperialist infrastructure.
Upon accepting this job, participants will be contracted the full required inputs: 18,880 units of Reactive Metals and 18,880 units of Water. You will be required to pay 18,889,440.00 ISK to accept this contract, representing the current market value of these materials. This job carries 0 ISK upfront reward, as materials are issued directly to ensure controlled production using secured stockpiles.
Upon successful completion and delivery of all required Water-Cooled CPUs, you will receive a final payout of 30,444,000.00 ISK.
Please note: Administrator availability may result in delays of up to 24 hours for issuing materials and final payment.
This CPU production drive is just one facet of a massive logistical mobilization. Following the updates published in the PANDORA MONTHLY DIGEST — MARCH in early April YC128, the Hearth Reborn initiative has rapidly expanded. Currently, capsuleers are participating as accepted contractors in numerous parallel Stage 2 operations running through May YC128.
These accepted contracts include the Jetunba Stage 2 – Microfiber Shielding Production (requiring 596 industrial runs), Polytextiles Production, and Polyaramids Production missions. Additional concurrent efforts where capsuleers are actively participating involve the manufacturing of Oxides, Genetically Enhanced Livestock, Fertilizer, Chiral Structures, and Precious Metals. These diverse materials—ranging from agricultural sustenance to advanced construction components—are all absolutely vital for sustaining colony growth and ensuring the structural development of newly established territories under the Hearth Reborn banner.
This is a freelance job, broadcasted from the following systems: Dammalin