LOADING...
ACTIVE
BACKUP
ACTIVE
FIREWALL
DETECTED
THREAT
PENDING
SYNC
LOCKED
DATA VAULT
IMPORTED FREELANCE MISSION
ENDED Sat 25 Apr 07:09:01 - Tue 28 Apr 08:36:34
0 enlisted
You have not enlisted
Login to see if you can take part

Campaign Overview: The Hearth Reborn

This campaign, officially designated as Jetunba Stage 2 - Mechanical Parts Production, runs from 25 April YC128 to 25 May YC128. It calls upon capsuleers to assist in Stage 2 of the Jetunba Do’bara: The Hearth Reborn initiative by producing 2,180 Mechanical Parts (equating to 436 intensive industrial runs).

Architects of the Hearth

The operation is spearheaded by T.R.I.A.D, an organization founded in YC108 that stands as an ideological pillar of the Matari resistance. Serving as a core executor of the Ushra'Khan alliance, T.R.I.A.D maintains an explicitly political and paramilitary mandate: the liberation of Minmatar slaves, the defense of tribal territories, and the systematic dismantling of Amarrian imperialist infrastructure.

The Dammalin Industrial Colonies

All finalized materials are to be delivered to the Dammalin VII - Moon 5 - Quafe Company Factory. Located in Dammalin, a vital 0.5 security status solar system, this delivery point is highly strategic. Dammalin is situated deep within the Huvilma constellation—a region historically known as "The Bleeding Hinge of Heimatar" due to its status as a volatile frontline theatre. Today, it stands as one of the most critical industrial and mining hubs in the Republic's mid-sec territories.

Contract Specifications

  • Required Output: 2,180 Mechanical Parts
  • Provided Inputs: 17,440 Precious Metals and 17,440 Reactive Metals (contracted upon acceptance)
  • Upfront Deposit: 19,705,456.00 ISK (based on current minimum sell prices)
  • Final Payout: 34,302,300.00 ISK upon successful completion and delivery

This job carries 0 ISK upfront reward, ensuring controlled production using secured stockpiles. Please note that administrator availability may result in delays of up to 24 hours for issuing materials and processing the final payment.

Broader Industrial Mobilization

This mechanical parts contract is just one facet of a massive logistical undertaking. Following the momentum highlighted in the PANDORA MONTHLY DIGEST — MARCH published on 6 April YC128, capsuleers have accepted numerous parallel assignments as active participants. Related ongoing operations include Jetunba Stage 2 - Precious Metals Production, which aims to refine 27,040 units of critical materials, and Jetunba Stage 2 - Construction Blocks Production. Furthermore, efforts like Jetunba Stage 2 – Huvilma Support Operations are currently running to sustain freed populations and rebuild fragile supply chains across contested space.

REWARDS ON OFFER
OBJECTIVES
HELP SUPPLY THE DELIVERY OF 2,176 UNITS OF Mechanical Parts TO Dammalin VII - Moon 5 - Quafe Company Factory
IMPORTANT NOTES

This is a freelance job, broadcasted from the following systems: Dammalin

Theme Color

RTL Support
Easily switch to right-to-left layout for Arabic, Hebrew, and other RTL languages.