LOADING...
ACTIVE
BACKUP
ACTIVE
FIREWALL
DETECTED
THREAT
PENDING
SYNC
LOCKED
DATA VAULT
IMPORTED FREELANCE MISSION
ENDED Sat 25 Apr 05:16:30 - Sat 25 Apr 12:29:14
Login to see if you can take part

Jetunba Stage 2 - Construction Blocks Production

This campaign runs from 25 April YC128 to 25 May YC128, calling upon capsuleers to assist in Stage 2 of the Jetunba Do’bara: The Hearth Reborn initiative. The primary objective is the production of 3,360 Construction Blocks (equating to 672 intensive industrial runs). All finalized materials are to be delivered to Dammalin VII - Moon 5 - Quafe Company Factory, located in the Dammalin system.

As a 0.5 security status solar system within the Heimatar region, Dammalin stands as one of the most critical industrial and mining hubs in the Minmatar Republic. It is situated deep within the Huvilma constellation, a region historically known as "The Bleeding Hinge of Heimatar" due to its volatile nature as a frontline theatre against the Amarr Empire.

Architects of the Hearth

The operation was authorized by DeT Resprox on behalf of T.R.I.A.D. Founded in YC108, T.R.I.A.D serves as an ideological pillar of the Matari resistance and a core executor of the Ushra'Khan alliance. Their operational mandate focuses heavily on the liberation of Minmatar slaves and the systematic dismantling of Amarrian imperialist infrastructure, making this industrial push vital for sustaining freed populations across contested space.

Contract Details & Compensation

To accept this job, participants will be contracted secured stockpiles containing the full required inputs: 26,880 Reactive Metals and 26,880 Toxic Metals. An upfront collateral payment of 23,213,568.00 ISK is required, based on current minimum sell prices. The job carries 0 ISK upfront reward to ensure controlled production. Upon successful completion and delivery of the Construction Blocks, participants will receive a final payout of 47,376,000.00 ISK.

Please note: Administrator availability may result in delays of up to 24 hours for issuing materials and final payment.

The Broader War Effort

This production drive does not exist in isolation; it is part of a massive, coordinated logistical web. Currently, capsuleers are actively engaged as Participants in numerous Accepted parallel contracts. These include Jetunba Stage 2 - Test Cultures Production, Jetunba Stage 2 - Supertensile Plastics Production, and Jetunba Stage 2 – Huvilma Support Operations. Additional concurrent operations demand the manufacturing of Biocells, Transmitters, Precious Metals, Water-Cooled CPUs, Viral Agents, and Microfiber Shielding. Following the strategic updates outlined in the recent PANDORA MONTHLY DIGEST — MARCH, these combined efforts ensure that the industrial engines of the Matari resistance remain ignited, reinforcing the fragile supply chains necessary to secure the Republic's borders.

REWARDS ON OFFER
OBJECTIVES
HELP SUPPLY THE DELIVERY OF 3,360 UNITS OF Construction Blocks TO Dammalin VII - Moon 5 - Quafe Company Factory
IMPORTANT NOTES

This is a freelance job, broadcasted from the following systems: Dammalin

Theme Color

RTL Support
Easily switch to right-to-left layout for Arabic, Hebrew, and other RTL languages.