Running from 22 April YC128 to 22 May YC128, with initial contract phases targeting a 6 May YC128 completion, Jetunba Stage 2 – Chiral Structures Production is a critical industrial operation. Capsuleers are called upon to assist in Stage 2 of the Jetunba Do’bara: The Hearth Reborn initiative by producing 36,480 units of Chiral Structures (equivalent to 1,824 industrial runs). These materials are absolutely vital for advanced construction and the deployment of robust colony systems across developing settlements.
All manufactured Chiral Structures must be delivered to the Dammalin VII - Moon 5 - Quafe Company Factory. The destination lies within Dammalin, a vital 0.5 security status solar system located deep within the Huvilma constellation of the Heimatar region. Recognized as a critical industrial and mining hub under Minmatar Republic jurisdiction, this system is essential to the logistical backbone of the Republic. The broader Huvilma constellation is historically known as the "Bleeding Hinge of Heimatar," serving as a critical frontline theatre against the Amarr Empire. Fortifying this region through industrial development is paramount to long-term Republic security.
This mission was created by DeT Resprox on behalf of the T.R.I.A.D corporation. Founded in YC108, T.R.I.A.D is a core executor of the Ushra'Khan alliance and an ideological pillar of the Matari resistance. Their operational mandate goes beyond mere industry; it is explicitly focused on the liberation of Minmatar slaves, the defense of tribal territories, and the systematic dismantling of Amarrian imperialist infrastructure. By participating in this campaign, capsuleers are directly supporting a disciplined force dedicated to the ethos of Tribal Liberation.
This production drive does not occur in a vacuum. It is supported by the foundational extraction efforts of The First Stones: Non-CS Crystals, which secured the raw materials required for this advanced phase. Currently, capsuleers are also actively participating in several parallel accepted missions to ensure the colony's survival and structural integrity, including Jetunba Stage 2 – Precious Metals Production, Jetunba Stage 2 – Reactive Metals Production, and Jetunba Stage 2 – Water Production.
To facilitate this massive undertaking, the following financial structures have been put in place:
Note: Please allow up to 24 hours for the issuance of contracts and final payouts due to administrator availability.
This is a freelance job, broadcasted from the following systems: Dammalin