Jetunba Do’Bara – Reactive Metals for the Framework
ENDED · NO MAPPED LOCATION · 29 SEP 2026 → 30 SEP 2026 EVE
Jetunba Do’Bara – Reactive Metals for the Framework
Progress is measured against the EVE Freelance Job target.
08 OCT 2026 16:58 EVE
Reactive metals will be processed into Water-Cooled CPUs, Mechanical Parts, Construction Blocks and Nanites. These materials will support the Market Hub’s structural framework, machinery, control systems and advanced production requirements.
Deliver 66,920 units of Reactive Metals to the designated construction reserve. Compensation is authorised at 438 ISK per unit. Jetunba’s industrial crews are prepared to begin processing as soon as sufficient quantities arrive.
No exact location is recorded in the EVE job restrictions. Check the job in EVE before contributing.
Credited contributions from the mission archive.
| RANK | CAPSULEER | TOTAL | RELATIVE TO LEADER | CALCULATED EVE JOB REWARD |
|---|---|---|---|---|
| 1 | 66,920 | 29,310,960.00 ISKNOT CONFIRMED ISSUED |
No capsuleers match this search.
No membership-duration rule is recorded for this mission.
Connect your EVE capsuleer to see the reward calculated from your recorded contributions.